ABB 07KT92 GJR5250500R0202

ABB 07KT92 GJR5250500R0202

Item Number:07KT92 GJR5250500R0202

Price: $1000



Anfon ymchwiliad
Disgrifiad
Paramedrau technegol

 ABB 07KT92 GJR5250500R0202 is designed specifically for ABB control systems. This module is ideal for compact applications requiring simultaneous status monitoring (e.g., pushbuttons, switches, sensor signals) and actuation control (e.g., indicator lights, miniature relays, solenoid valves). By integrating input and output functions into a single module, it significantly saves control cabinet space and hardware costs, making it ideal for small control systems or distributed I/O stations.

 

ABB 07KT92 GJR5250500R0202

 

 

07KT92
GJR5250500R0202

15*15*12cm

0.81kg

 

Access to the AC31/CS31 basic units (07 KR 31, 07 KR 91, 07 KT 92 to 07 KT 94) and to the communication processor 07 KP 62 of ABB Procontic T200 is conducted via the serial interface COM1.

– Terminal in the VT100 mode

– Computer with VT100 emulation

 

The serial interface COM 1 must be set to the operating mode "Active mode" to use the operating and test functions.GJR5250500R0202

RUN/STOP switch in position: STOP. In the switch position ST, O, P, the PLC generally sets the operating mode "active mode" on COM 1.

RUN/STOP switch position.RUN In the switch position, RUN the operating mode "active mode" is set on COM 1, when one of the following two conditions is fulfilled:

– System constant KW 00,06=1

– System constant KW 00,0,6=0 and Pin 6 on COMa 1 has 1-signal (1-signal on Pin 6 is set by using the system cable 07 SK 90 or by not connecting Pin 6)

 

The processing of the PLC program has higher priority than the communication via the serial interfaces.

The PLC operates the receiving direction of the serial interface COM1 with interrupt control. During a running PLC program cycle, incoming characters respectively trigger an interrupt impulse, which interrupts the running PLC program until the received characters are stored in the reception buffer. To avoid a permanent interruption of the program processing, the PLC controls the data reception via the RTS line so that it takes place in the breaks between two PLC cycles.

The PLC processes the jobs received via COM1 exclusively in the breaks between the PLC program cycles. The output of characters via COM1 is also only conducted in the breaks between two program cycles. The lower the utilisation rate of the PLC is, the longer the breaks are between the program cycles and the higher the possible communication rate is to COM1.

 

The synchronisation of the data exchange between the control and the connected unit is conducted via the hardware handshake lines RTS and CTS.

– Reception buffer has reached a certain fill.

– A PLC program cycle is just running.

The control still reacts during output of characters in addition to the XOFF/XON characters of the connected unit. The control itself does not use these SW handshakes.

 

In the breaks between two PLC program cycles, the PLC processes the jobs collected in the reception buffer. To do this, the characters are read out of the interrupt-controlled reception buffer by the PLC, immediately echoed via COM 1, checked for correct syntax, and then processed. The characters are echoed in the same order as received via COM 1.

 

07DO90-S 07KT95
07KP90 07KT97F1
07DC91 07KT97C
07DC91 07KT97D
07MK92 07KT97B
07KT94 07KT97C
07KT94D 07KT97
07KT94K 07KT97B
07KT94i 07KT97B
07KT94 07KT97B
07DC92 07KT97B
07DC92E 07KT98E2
07DC92F 07MK92
07DC92B 07DI92
07AC91 07KT95
07KR31 07MK62

 

 

 

 

Tagiau poblogaidd: abb 07kt92 gjr5250500r0202, China abb 07kt92 gjr5250500r0202 manufacturers, suppliers